Home/Projects/Renovation + Refurbishment Print This Page

Arc Studio was challenged to modernize the exterior and three stories of the interconnected lobby space at the Canadian Western Bank Place Tower in downtown Edmonton.

As a former flower shop transformed into an open-concept office space, Arc Studio's collaborative home exudes clean lines with organic inspirations.

A renovation of an existing warehouse into a professional showroom, warehouse, office, and amenity space for the commercial furnishings company.

The 102 Street Centre redevelopment was a concept design exploration into evolving the existing Manulife Phase 2 tower podium into a large single-tenant office space incorporating additional floor area and new rooftop amenities.

The Myer Horowitz Theatre is a multi-purpose concert hall situated in the Students' Union Building on the University of Alberta campus. It has offered thousands of performances to millions of people since opening in 1967

The Central Academic Building (CAB) project at the University of Alberta was an architectural transformation at a major confluence point of a bustling student body on campus.

Originally built in the early 1960s, Edmonton's Royal Glenora Club is one of the city's premier Athletic and Social Clubs nestled in the heart of Edmonton's beautiful River Valley.

Formerly known as Enbridge Place, this 1970s-era striking all-black modern skyscraper in the style of Mies van der Rohe was given a complimentary interior transformation and enhancement to the podium and plaza.